September 29, 2026
For decades, architects designing warehouses, distribution centers, and cold storage facilities operated under a simple assumption: grid power is ready when you are. You specified the electrical requirements, coordinated with utilities, and moved on to more pressing design challenges. Power was infrastructure, not something that shaped layouts, square footage, or long-term flexibility. That assumption no […]
